Our Projects - ROSTI - Head Office Relocation

ROSTI Logo

The Brief - Phase One

Rosti Automotive are a long-established designer and manufacturer of precision components and assemblies for the Automotive Sector.

We were appointed as the principle contractor for their extensive move to a new purpose-built head office.

Our turn-key design and build fit out solution covered all aspects of the impending move.

Following extensive planning meetings, the design process and technical schedule was agreed.

Services Supplied

  • Office Space Planning and 2D CAD Drawings.
  • New electrical installation throughout the building.
  • New data connections installed throughout the building.
  • Design and Install Partition walls.
  • Install Suspended Ceiling throughout with LED lighting.
  • Install flooring throughout including; carpet tiles and Karndean wooden flooring.
  • Design and Install new welfare facilities including new and disabled toilets.
  • Install a functioning shower room.
  • Design and install Kitchenette.
  • Install Air conditioning and heating units.
  • Painting and decorating throughout.
  • Build a server room.
  • Supply and Install Media including Plasma TV’s and Projectors for meeting rooms.
  • Sound proofing offices.
  • Supply and install office furniture including height adjustable desks and bespoke reception desk.

The Outcome

Phase One of the project was very extensive. We completely transformed a shell of an office into a purpose-built, modern head office. Every aspect of the build was done to the highest of standards. The space available was utilised to be most effective, offering a spacious and comfortable working environment with modern kitchen and welfare facilities for staff and visitors.  The reception area was designed for maximum impact with a bespoke reception counter and seating upholstered in the corporate colours.

The Brief - Phase Two

Phase Two of the project was to redesign and refurbish the first floor of the new head office building.

Services Supplied

  • Design and create three new Director offices.
  • Update and enhance the lighting.
  • Install Power and Data connections.
  • Install flooring throughout.
  • Install a fully functional shower room and welfare facilities.
  • Design and install a kitchenette.
  • Painting and Decorating throughout.
  • Install security lighting to the outside of the building.

The Outcome

Phase two of the fit-out project, brought the whole building together. Now the first floor matched the rest of the building with three new director offices, welfare facilities and kitchenette.