JUMBO STUD PARTITION - SAFETY FLOORING - GLASS DOORS - LIGHTING - ELECTRICAL - AIR CON - SUSPENDED CEILING - PAINTING & DECORATING
THE BRIEF
The Parker E-ACT Academy is a secondary school for 11–18 year old children with academy status situated in Daventry, Northamptonshire, England.
After successfully winning the tender we were asked to provide a number services during the academy’s closure to students during lock down/summer holidays. There was paramount importance for all works to be completed before students return in the September.
SERVICES PROVIDED
- Install a Jumbo stud partition wall
- Replace carpet in certain areas
- Install a toughened glass sliding door
- Replace a sliding door to a swing door
- Divide 2 classrooms into 4 class rooms using partition walls
- Install new fire door
- Install new LED lighting in new classrooms
- Install new electrical connections
- Install no-slip Safety flooring
- Painting & decorating
- Create staff hub area
- Install new air conditioning unit
- Knocked down a wall and install new lintels
- Install a suspended ceiling in new classrooms
- Replace a double door
- Install new Patson electronic door access system