THE BRIEF
King Edward VI School is a prestigious all girls school based in Birmingham.
Pure Office Solutions Ltd has been contacted by KES Birmingham to refurbish and fit out their existing staff office in the girls school.
A complete refresh of the staff office was required which includes clearing out of existing furniture, data and power cabling, painting and decorating, commercial flooring, ceiling and lighting, new air-conditioning system and new furniture and storage solutions.
The design brief was to give the office a bright feel while keeping the furniture traditional finishes and still accommodating the same number of staff in the office.
SERVICES PROVIDED
- Office Space Planning and 2D CAD Drawings
- Commercial flooring
- Suspended Ceiling and lighting
- Air-conditioning system
- Painting and decorating
- Power and data cabling
- Office Furniture Fit Out
THE OUTCOME
Pure Office Solutions Ltd has transformed the existing office to client requirements. The result was a brighter, more organized open office with plenty of storage space and better air conditioning system.
A new power and data system has been put into place where the new bench desk positions are.
We have also installed new bench desking system with single monitor arms, divider screens and a bespoke shelf to maximize desk working space for each member of staff.
A storage system allocated for each person has also been put in place in section of the offices to minimize clutter.
Their choice of finish colour for the furniture is Natural Oak and white metal work combination with some grey upholstered screens to keep the neutral scheme in the office. Colour was introduced throughout the office by seating in some lilac and purple seating.